City Lofts Chodov with GARTAL
I structured the investment deal between the investors and the developer for a 126-apartment development in Prague and now provide investor-side construction control.
Under construction · investor-side mandate from 2025Real estate development and capital projects,
engineering businesses, and places for public life.
A portfolio of work since 2006.
Explore the work
70 projects & programmes
I structured the investment deal between the investors and the developer for a 126-apartment development in Prague and now provide investor-side construction control.
Under construction · investor-side mandate from 2025I develop and manage a historic residential property, bringing nine existing apartments and a four-home courtyard proposal into one asset strategy.
Film availableAs LONO’s co-founder for Product & Technology, I turn wellness and longevity briefs into coordinated property, service and technology products.
I coordinated technical and cost decisions for the client during Netpeak Group’s Kyiv office fit-out: five premises totalling 937 m² in the contract, with a main level and mezzanine. I reviewed design, quantities, procurement and completed work amid power cuts and supply constraints.
Office in use; technical follow-up continuesI managed the reconstruction of a three-level Tuscan villa, coordinating the complete house, its building systems and outdoor programme to shell-and-core.
Shell-and-core stage reached · 2023–2025I developed Innovation Kitchen as a working technology and education hub, combining laboratories, a school, coworking and food provision in one building.
Film availableI defined ITown’s mixed-use development programme and led the architect appointment and coordination through approval of the district masterconcept.
Film availableI helped finance a biodiversity programme that brought scientific work into three Odesa cultural venues and reached more than 4,000 visitors.
Film availableI supported creative activities at Prostranstvo that turned shared spaces into places for making, meeting and exchange.
Film availableI developed a regeneration and operating programme for a 26.7-hectare protected park, putting its first revenue-generating businesses into operation.
Programme and initial operationsI developed food and beverage formats as complete businesses, linking the service offer and economics with interiors, equipment and opening.
Film availableI develop the reuse programme for a historic Odesa property, reconciling its protected building fabric with a viable new hospitality proposition.
Active pre-development and permitting preparationI coordinated Radostna’s residential masterconcept at the scale of an 18-hectare city quarter, joining building volumes, public space and phased development.
MasterplanI co-funded research infrastructure and a three-volume conservation publication, linking a functioning scientific station with the means to share its work.
Co-funding deliveredI co-funded the outdoor part of VERUM IN GRANO, placing a biodiversity exhibition along an everyday pedestrian route.
Film availableI selected the restaurateur, structured the deal and carried Yourz Bistro through the full delivery cycle to opening.
OpenedI led general contracting and project management for the reconstruction of a 3,477 m² municipal school complex as a children’s and youth creative centre.
Contracted reconstruction; participation 2019–2021I led a two-section housing development through the full design cycle, construction and sales, completing my scope before the partner’s commissioning and handover work.
Own construction, design and sales scope completedI prepared a turnkey contracting proposition for nine duplex homes created from the attic spaces of two existing Vienna buildings.
Preconstruction proposal · construction not started in the retained recordI undertook general-contracting preparation and early works for two residential buildings with twelve apartments in Vienna.
Construction preparation and early works · subsequently pausedI represented the client from the search for a manager to lead operator negotiations through to handover of the completed 51-room hotel to the operator and its technical team.
Film availableI created and led complementary façade businesses with more than 100,000 m² of cumulative design, production and execution scope.
Delivered portfolioI coordinated development and design preparation for Third Turtle Resort & Marina on a 6.88-hectare site in Turks & Caicos, aligning a proposed 140-key accommodation scheme with operator requirements and island delivery conditions.
Development preparationI established four specialist businesses and their delivery relationships, extending a Ukrainian construction base into five countries and territories.
Businesses establishedI led the engineering-business delivery of Hawaii aquapark’s sculpted envelope, connecting complex geometry with production and installation.
Film availableI coordinated engineering and execution for the Kyiv Steakhouse, bringing building services and specialist fit-out into a complete restaurant interior.
Completed scopeI led the businesses that engineered and delivered a 5,042-plate kinetic façade for Odesa’s sea terminal.
Film availableI led the specialist businesses delivering GreenWood’s glazing, shading and balcony-envelope packages.
Specialist package deliveredI led façade businesses working across Golden Era’s residential buildings, coordinating glazing and layered façade finishes at programme scale.
Specialist package deliveredI led specialist design and delivery work for Rybalskyi’s residential façades across four sections in two buildings.
Specialist package deliveredI led the engineering businesses connecting brick, metal and glazing into the residential envelope on Dmytra Donskoho Street.
Specialist package deliveredI led specialist façade work on Nedelina, joining residential glazing and finishes with the commercial frontage at ground level.
Specialist package deliveredI led FES and Tech Facade’s engineering, production and installation work for Bezalel’s residential envelope and café atrium in Odesa.
Specialist package deliveredI led specialist glazing delivery for a municipal service complex, connecting public access structures with internal glass spaces.
Specialist package deliveredI led the façade-business work forming a glazed entrance and reception environment for a public administration building.
Specialist package deliveredI led the specialist business delivering glass constructions and office partitions within Agromat’s materials showroom.
Specialist package deliveredI include two City Center shopping developments in the construction-business portfolio, with their full retail and leisure scale made explicit.
Completed company-portfolio projectsI directed the delivery of a prefabricated natural-material house near Prague, connecting design, panel production, international transport and site assembly.
Built · project record 2017–2020I undertook general contracting and project management for a 38-apartment residential complex in Germany.
Contracted work documented in 2019I coordinated technical and commercial work for an 18-apartment Vienna redevelopment, turning an evolving design and cost position into a defined tender scope.
Design and delivery work documented · 2016–2019I led construction-business work creating five attic apartments and renewing the façades of an existing Vienna residential building.
Contracted scope completed · December 2018–July 2020I led FES’s delivery of a planted entrance arch that gave Arcadia’s public space a recognisable threshold.
Film availableThrough Sandrobud, I supported Odesa by Touch, a public programme of tactile architectural models.
Film availableI built three specialist companies and a project-management centre to lead a multi-asset development programme of approximately 780,000 m².
Multi-stage portfolioI shaped the hotel product for the client’s operator and led its delivery as Technical Director of the general contractor, from defining the brief through design coordination, procurement and construction.
Completed hotel complexI developed Rodnye Berega as my own hotel project, connecting the owner’s programme with reconstruction, procurement and site delivery.
Delivery documented in 2013I led the first 210-apartment residential delivery through the platform I built, establishing the working model for the sites that followed.
Completed during the mandateI led technical and portfolio delivery for a 369-apartment development, extending the construction platform to a second completed residential asset.
Completed during the mandateI led the delivery platform for a 468-apartment residential development, with completion of the first development and a separate subsequent phase.
I led the technical and portfolio work advancing a 502-apartment residential project into late delivery and close-out.
I coordinated a three-phase housing programme of approximately 93,000 m² and 1,491 apartments through the development-delivery platform.
Phased construction during the mandateI led technical and portfolio coordination for a 425-apartment high-rise programme that reached advanced delivery during my mandate.
I coordinated a three-building residential cluster with 1,167 apartments and 630 parking spaces as a single site-wide delivery programme.
Construction during the mandateI led technical and portfolio work taking a 306-apartment development from early works into construction.
Construction during the mandateI coordinated several urban housing sites through one delivery system, covering a combined programme of 36,109 m² and 397 apartments.
I led technical and portfolio preparation for a paired residential development with a 38,824 m² programme and 532 apartments.
I coordinated a 20,366 m² historic-city concept combining 147 apartments, retail and 118 underground parking spaces.
Concept and design developmentI coordinated the development brief and design for a 20,114 m² shopping-centre concept with 268 parking spaces.
Concept and development preparationI connected the commercial brief, design and construction preparation for an 18,995 m² retail development.
Design and early deliveryI managed technical and portfolio interfaces for a 15,367 m² central-city retail programme during development and construction.
Development and construction during the mandateI coordinated a 5,971 m² office building within a wider coastal estate and its shared construction programme.
Construction and close-out during the mandateI coordinated a ten-storey seafront office development with a 23,555 m² overall programme and 199 planned parking spaces, linking the natural-stone facade with the structure, parking and shared site infrastructure.
Film availableI led technical and portfolio coordination for an emergency-hospital building within the development platform.
I led technical and portfolio delivery of Berth 16 at Odesa port, completing the reconstruction two months ahead of schedule.
CompletedI led technical and portfolio governance for Berth 10 at Yuzhny, taking a port-development programme into execution.
Implementation commenced, then stoppedI led the technical and commercial preparation of a winning reconstruction tender for three berths at Illichivsk.
I created an owner-side construction-management department and carried three different property projects to opening, tender and sale.
Department establishedI coordinated a 255 m² adaptive reconstruction for ITIS Gallery, carrying the owner’s showroom brief through to opening.
Opened in 2008I led owner-side design and tender preparation for a three-phase, 52,885 m² mixed-use development near Odesa Airport.
Tender documentation acceptedI led owner-side preparation of a historic-centre project combining attic reuse and new office-commercial infill, advancing it to sale after concept.
Sold after conceptTry another sector, type or chapter.
The common thread
From an owner-side project department to an integrated development platform, specialist engineering companies and international ventures. The work joins technical, commercial and organisational decisions.
Read the profile