← All work

Retail & workplace · Development mandate

Historic-centre development — a concept advanced to sale

I led owner-side preparation of a historic-centre project combining attic reuse and new office-commercial infill, advancing it to sale after concept.

Place
Ukraine
Portfolio chapter
2006–2008
Stage reached
Sold after concept
Role
Owner-side governance and pre-development
Proposed historic-centre infill. Concept: Officina Architetti / Hembert Peñaranda.

The development joined reconstruction of existing attic premises with connected new office and commercial space. The project had to be considered as one feasibility and design proposition within a constrained historic-city setting.

I set the owner-side management framework and supervised the appointed project manager. The work linked heritage and permitting conditions with the concept and project information needed for an owner’s development or sale decision.

The property project was sold after concept development. Construction delivery was outside that mandate.

Project credits
Architecture and concept design: Hembert Peñaranda / Officina Architetti. Proposed architecture, 2008.